Post installed rebar connections using chemical anchoring

Due to the short construction period and complex construction conditions, design changes or modifications often occur during the construction process.So need post installed rebar connections using HM-500 chemical anchoring

Post installed rebar connections using chemical anchoring


Project overview

The building is 26 stories above ground and 3 stories underground, with an elevation of 17.30 meters and a reinforced concrete frame shear wall structure. Due to the short construction period and complex construction conditions, design changes or modifications often occur during the construction process.So need post installed rebar connections using HM-500 chemical anchoring


Strengthening materials

Steel rebars:HRB335

HM-500 injectable anchoring adhesive


post installed rebar